I5AA5
Canceled
Timeline :
Saturday, March 22, 2025 - 12PM - 3PM
Property Address :
6060 Schooner Dr Van Buren Twonship MI 48111 Belleville, Michigan 48111
You have accepted this work order. Please send your quote to the admin
X You have rejected this work order.
The admin will be informed and re-assign the task.
Work Order Details :
Henry has details and blue prints please contact henry for this do not contact owner at this time.
Access & Contact Info :
call henry
You Have Rejected This Work Order, It Will Removed by Admin.
Work Order Marked Completed.
Work Order Images
Nothing to See Yet!
Send Your Quote
Your Quote :
25,000
Quote Details :
MATERIALS FOR WALLS:
pan head screws-4 boxes=$75
20-Gauge EQ Galvanized Steel Wall Framing Studs-(85)-$900
5/8 in. x 4 ft. x 12 ft. Firecode X Drywall-(60SHEETS)-$1400
4- five gallons of paint and primer-$600
mud, tape,sandpaper-$350
LABOR FOR WALLS: INSTALL APPROX 80 SHEETS FIRE RATED DRYWALL,METAL FRAMING STUDS, MUD TAPE AND SAN AND PRIME AND PAINT, INSTALL 6X6 BATHROOM WALLS, 8 DAYS LABOR, 5 GUYS-$14000
WALL HEATER MATERIALS: 100K BTU GARAGE WALL HEATER, GAS PIPE AND ELECTRICAL WHIP-$2700
WALL HEATER LABOR& PERMIT-$2100
PLUMBING MATERIALS: 3/4 PEX LINES, COPPER PIPE FROM MAIN, TOILET FLANGE, SINK TRAP-, sink, toilet-$1450
PLUMBING LABOR AND PERMIT-$3000
ELECTRICAL PERMIT AND MATERIALS- 6 LED CEILING LIGHTS, WIRE, JUNCTION BOXES, CONDUIT RUNS-$2500
Price is good for 20 days,
Your quote has been sent to the admin
An error occurred. Try again later
Chat With Admin
Larry Shirley : Please email details and drawings
🔴Larry Shirley : Called Sam no answer awaiting call back
🟢 Admin : Henry informed us that you and him will be walking this together
🟢 Admin : MATERIALS FOR WALLS:
pan head screws-4 boxes=$75
20-Gauge EQ Galvanized Steel Wall Framing Studs-(85)-$900
5/8 in. x 4 ft. x 12 ft. Firecode X Drywall-(60SHEETS)-$1400
4- five gallons of paint and primer-$600
mud, tape,sandpaper-$350
LABOR FOR WALLS: INSTALL APPROX 80 SHEETS FIRE RATED DRYWALL,METAL FRAMING STUDS, MUD TAPE AND SAN AND PRIME AND PAINT, INSTALL 6X6 BATHROOM WALLS, 8 DAYS LABOR, 5 GUYS-$14000
WALL HEATER MATERIALS: 100K BTU GARAGE WALL HEATER, GAS PIPE AND ELECTRICAL WHIP-$2700
WALL HEATER LABOR& PERMIT-$2100
PLUMBING MATERIALS: 3/4 PEX LINES, COPPER PIPE FROM MAIN, TOILET FLANGE, SINK TRAP-, sink, toilet-$1450
PLUMBING LABOR AND PERMIT-$3000
ELECTRICAL PERMIT AND MATERIALS- 6 LED CEILING LIGHTS, WIRE, JUNCTION BOXES, CONDUIT RUNS-$2500
🟢 Admin : Hello Larry the customer is asking for the bid can you send it please
You Haven't Uploaded Anything Yet!
Your update has been submitted
An error occurred. Try again later
Message sent!
Your content has been submitted