.png)
P2TG2
Canceled
Timeline :
Friday, September 13, 2024 - 9AM - 12PM
Property Address :
20639 Fairview Dr, Dearborn Heights, MI 48127
You have accepted this work order. Please send your quote to the admin
X You have rejected this work order.
The admin will be informed and re-assign the task.
Work Order Details :
Quote - Remodeling 2 bathrooms 1 bathroom property owner wants a stand up shower
Access & Contact Info :
Mahmoud - 3134188582
You Have Rejected This Work Order, It Will Removed by Admin.
Work Order Marked Completed.
Work Order Images
Nothing to See Yet!
Send Your Quote
Your Quote :
$3100.00
Quote Details :
1) remove tub and replace with accessible shower stall kit W/O doors, ** SEE UPLOADED PHOTO FOR REFERENCE**
reconfigure drain pipes for center position drain currently right hand drain, install new shower faucet single handle will include replacing any plumbing and rebuilding necessary
***ALL MATERIALS AND LABOR INCLUDED***
2) customer requested 1/2 bath to be converted to full bath but after seeing in person and calculating this is not plausible
Not something I feel comfortable doing.
Customer should consider adding a full bath in basement in my opinion.
Your quote has been sent to the admin
An error occurred. Try again later
Chat With Admin
Roberto Garza : Customer wants main bathroom bathtub removed and shower stall prefab installed, Drean moved to the center and new shower faucet installed
Customer wants half bath remodeled, and a shower stall installed, it is my professional opinion that a shower is not an option. The bathroom is too small and require extensive work, even if we did as customer was asking us to do.
🔴Roberto Garza : I need to do some research on prefab shower stalls to give accurate quote. I will update with an estimate by 9/16
🟢 Admin : thank you for the update!
🔴Roberto Garza : Scope of work to be performed:
Remove existing bathtub in main bathroom reconfigured drain to be a center position drain currently a right handed drain. Demo shower walls Install green board where walls are currently ceramic tile, Install a prefab Accessible tub surround standup shower Install new shower faucet and plumb as necessary.
2) Custom build shower in half bath You include a partition wall Tile walls and shower floor install New waterlines and shower faucet also install center Located drain move location of toilet From current location to where door Leads to basement Cut hole in floor for drain pipe And toilet flange run waterline to supply toilet with shut off Removed door frame and drywall both sides, Install new vanity of customers choice fitting To new area left from custom shower stall build ,, We will attempt to keep original flooring that exist in that half bath, but if necessary, we will replace that as well, but only if it is needed in such cases as we crack tiles during construction.
🔴Roberto Garza : Waterlines will be ran in Pex
Drains ran in DWV PVC
You Haven't Uploaded Anything Yet!
Your update has been submitted
An error occurred. Try again later
Message sent!
Your content has been submitted
Your content has been submitted