.png)
J4KV4
Completed by Contractor
Timeline :
Monday, September 30, 2024 - 3PM - 6PM
Property Address :
6742 Lamphere St, Dearborn Heights, MI 48127
You have accepted this work order. Please send your quote to the admin
X You have rejected this work order.
The admin will be informed and re-assign the task.
Work Order Details :
Quote installing drywall in the basement property owner is looking to remodel BE AT PROPERTY AT 3PM
Access & Contact Info :
Sarah - 313-744-3431
You Have Rejected This Work Order, It Will Removed by Admin.
Work Order Marked Completed.
Work Order Images
Nothing to See Yet!
Send Your Quote
Your Quote :
$17,350.00
Quote Details :
Install six 6 panel doors @ $120 per door material cost customer chose doors pre hung on existing rooms and rooms to be built.
install vent grate for fresh air make up for mechanical room enclosure to be built. Drywalling only exterior of room 9’4”X 7’6”
also build new non existent bathroom to be 7’ x 10’ drain already located in planned area for bathroom that we can tie into , we will have to add toilet , custom built shower customer emphasized “NO INSERT” and sink/vanity all require drainage and supply lines both above and underground, install studor vents as needed.
Frame and Drywall entire basement approximately 1600 ft.² 8’ high walls including adding three closets, one bathroom, one laundry room, one mechanical room 9‘4“x 7‘6“
one office space existing but needs framing for drywall and add approximately four outlet receptacles 10‘ x 11 common area with kitchen 23 ‘X12’6”
Bedroom measuring to be 14‘3“X 10‘2“ in this 10’W-x24”D closet , add approximately (4) outlet receptacles.
Install kitchen cabinets 10 feet long, countertop sink , garbage disposal , number of cabinets,TBD by location of stove, refrigerator, and upper cabinets to be determined by owner will have to install underground pipework for drainage and bring in supply lines for freshwater approximately 31 feet of freshwater pipe 7 feet of underground pipe, add six outlet receptacles and one 220v Which is plug for stove.
Build bathroom 10’ x 7’ drywall walls and ceiling using greenboard moisture resistant.
Install drain underground for toilet and sink build a shower stall and tap into existing floor drain system, remove existing floor, drain and install new PVC with shower drain, install cement board and ceramic tile the shower floor and shower stall , then install shower doors of customers choice. , install toilet, and all plumbing fixtures run plumbing for freshwater approximately 25 linear feet
Add recessed lighting times 15 lights will include running wire from power source of existing lights to recessed lighting installation
Frame and drywall laundry room, 10‘1“X 6‘10“ will have to relocate underground pipe for drainage approximately 5 feet and relocate laundry tub and water supply approximately 5 feet as well. Add 2 outlet receptacles. Vent fan and lighting. Relocate gas and electrical to this room approximately 10 feet.
Level stairs that are sloping to basement,X9 treads
Install linoleum in kitchen area, office area bedroom and common hall approximately 600 ft.²
Drywall storage room next to laundry 8 x 10‘ install 1 of the 6 doors also
Add 2 receptacles outlets
**THIS ESTIMATE INCLUDES ALL MATERIAL AND LABOR**
(AS WELL AS PLACING APPLIANCES BUT NOT DELIVER)
(Except kitchen cabinets, toilet, vanity, new laundry tub, shower doors , appliances, faucets and ceramic tile and/or linoleum per customer request they will provide these materials)
**3 - 4 WEEK TIME TO COMPLETE **
*** separate bid converting porch area into laundry room**
Open wall in bathroom and install a header and door to access new laundry room addition, pull up deck boards and insulate under decking, replace decking for substrate install vapor barrier i.e tyvek or equivalent, then install subfloor 1/2” plywood bring drainage system and water lines into addition approx. 25’ of water lines and estimated 30’ drain line build/frame exterior wall insulate drywall interior drywall ceiling add lighting 4 recessed lights with switch. add (2)120v outlet receptacles and (1)220v receptacle , add a vinyl window approx. 24”h X 36”W plywood and tyvek exterior then install siding matching as close as possible to existing 8” aluminum siding and paint to match house color. $6,800.00 includes ALL LABOR AND MATERIAL
Your quote has been sent to the admin
An error occurred. Try again later
Chat With Admin
Roberto Garza : Appointment has been met, this job is very large, but I will have the estimate over later this evening
🔴Roberto Garza : 1) skin and texture 2 ceilings in basement
Office and bedroom and paint $650/ $325 per room includes labor and material
2) install HVAC runs and vents to office and bedroom , both must be brought thru cinder block wall $475 for both rooms labor and material included
3) prep and apply garage floor epoxy to 2-1/4 car
garage $850 material and labor
4) assure all drain clean outs have an access panel where dry walled or cabinets installed in basement project. $0.00
5) install HVAC for new laundry room and exhaust fan $285 material and labor
6) spray basement ceiling black where no drywall will be installed, paint entire area of all projects approx 2200 sq ft. Approx. 15 gallons of paint
$2200
Incudes labor and material
7) install water spigot on/at rear of house
8) install exterior style door at bottom of stairs leading to garage with locket $575 includes labor and material
9) assure hvac runs under house in crawl space are proper and impinged $150 material and labor
10) build and install simple shelving system in basement storage room $200
🔴Roberto Garza : Total additional work $5,385
🟢 Admin : Hi please make sure to update end of the day today with progress and pictures and update henry or Richard if possible thank you
🔴Roberto Garza : Ok
🔴Roberto Garza : Ok
You Haven't Uploaded Anything Yet!
Your update has been submitted
An error occurred. Try again later
Message sent!
Your content has been submitted