Work Order Details :
Edit Info
Quote - additional work needed at property
Access & Contact Info :
Edit Info
Sarah k
Assigned Contractor :
Roberto Garza
Schedule :
Monday, October 21, 2024 - 9AM - 12PM
Contractor's Quote:
$7690.00
Quote Details:
1. Building a drainage system in the front yard and directing it to the drain pipe inside the sewer to prevent water from pooling on the walkway and street during rain. for a total of $1000
***Concrete contractor will be cutting driveway for access of drain system install, Garza will lay new cement after pipe work***
2. Encapsulating the crawl space wall as and floor/dirt foundation
Using 12 mil polyethylene cross woven crawl space vapor barrier,12 mil tape and stakes
$2590 ***includes all labor and material***
3. Building a shed supplied by customer on pallet footing at customers request to NOT have cement pad and rat wall $500
4. Converting the bathtub in the bathroom into a walk-in shower with glass.
Remove existing bathtub and build custom shower pan with right hand drain,install cement board on walls where tub was and
Tile down to floor 60”x28”x28”x approx. 18”h
Build 6” ledge install shower drain and 40 mil pan liner , cement and level to drain properly tile shower floor, alter plumbing if required , install customer provided shower doors
$2600.00
5) Divert all downspouts for gutter system to underground 8feet away from house and end in a French drain/dry bed of pea gravel and 3/4 rock.
$200 per downspout X5 =$1000
**includes all labor and material**
I1VD1
Invoice Prep & Owner Approval
Nothing to See Yet!
Contractors
I'm a paragraph.
This task already has a contractor. If you want to assign another contractor to this task, remove the current contractor
Assigned Contractor :
Roberto Garza
Contractor Removed!
Chat with the Investor
Message sent!
Chat with the Contractor
Nothing to See Yet!
Message sent!