This Task Is Now Completed.
Work Order Owner :
Submitted by Admin
Submission Date :
September 13, 2024
Property :
20639 Fairview Dr
Work Order Details :
Edit Info
Quote - Remodeling 2 bathrooms 1 bathroom property owner wants a stand up shower
Access & Contact Info :
Edit Info
Mahmoud - 3134188582
Assigned Contractor :
Roberto Garza
Schedule :
Friday, September 13, 2024 - 9AM - 12PM
Contractor's Quote:
$3100.00
Quote Details:
1) remove tub and replace with accessible shower stall kit W/O doors, ** SEE UPLOADED PHOTO FOR REFERENCE**
reconfigure drain pipes for center position drain currently right hand drain, install new shower faucet single handle will include replacing any plumbing and rebuilding necessary
***ALL MATERIALS AND LABOR INCLUDED***
2) customer requested 1/2 bath to be converted to full bath but after seeing in person and calculating this is not plausible
Not something I feel comfortable doing.
Customer should consider adding a full bath in basement in my opinion.
P2TG2
Canceled
Nothing to See Yet!
Contractors
I'm a paragraph.
This task already has a contractor. If you want to assign another contractor to this task, remove the current contractor
Assigned Contractor :
Roberto Garza
Contractor Removed!
Chat with the Investor
Message sent!
Chat with the Contractor
Roberto Garza : Customer wants main bathroom bathtub removed and shower stall prefab installed, Drean moved to the center and new shower faucet installed
Customer wants half bath remodeled, and a shower stall installed, it is my professional opinion that a shower is not an option. The bathroom is too small and require extensive work, even if we did as customer was asking us to do.
🔴Roberto Garza : I need to do some research on prefab shower stalls to give accurate quote. I will update with an estimate by 9/16
🟢 Admin : thank you for the update!
🔴Roberto Garza : Scope of work to be performed:
Remove existing bathtub in main bathroom reconfigured drain to be a center position drain currently a right handed drain. Demo shower walls Install green board where walls are currently ceramic tile, Install a prefab Accessible tub surround standup shower Install new shower faucet and plumb as necessary.
2) Custom build shower in half bath You include a partition wall Tile walls and shower floor install New waterlines and shower faucet also install center Located drain move location of toilet From current location to where door Leads to basement Cut hole in floor for drain pipe And toilet flange run waterline to supply toilet with shut off Removed door frame and drywall both sides, Install new vanity of customers choice fitting To new area left from custom shower stall build ,, We will attempt to keep original flooring that exist in that half bath, but if necessary, we will replace that as well, but only if it is needed in such cases as we crack tiles during construction.
🔴Roberto Garza : Waterlines will be ran in Pex
Drains ran in DWV PVC
Nothing to See Yet!
Message sent!